What We Source
Easy Source Global supports sourcing for a wide range of industrial and commercial equipment. We identify comparable overseas manufacturers, review supplier credibility and help businesses access competitive sourcing options without compromising performance.
Industrial and Commercial Products
Easy Source Global supports sourcing for a wide range of industrial and commercial equipment, including:
Chillers
Water-cooled and air-cooled chillers for industrial, process and commercial cooling applications.
Warehouse Fans
HVLS, exhaust and circulation fans for factories, warehouses and large commercial facilities.
Pumps
Centrifugal, end-suction, booster and process pumps for multiple fluid-handling applications.
Air Compressors
Screw, piston, oil-free and industrial compressor systems for dependable compressed-air supply.
Heat Exchangers
Plate, shell-and-tube and brazed heat exchangers for efficient heat-transfer applications.
Custom Skids
Engineered and fabricated skids for process equipment, mechanical systems and packaged solutions.
Commercial HVAC Systems
Rooftop units, AHUs and commercial HVAC systems for industrial and commercial facilities.
Refrigeration Equipment
Walk-in coolers, freezers, condensing units and complete commercial refrigeration systems.
CNC Machines
CNC lathes, mills, machining centres and related precision-manufacturing equipment.
Modular Offices
Prefabricated offices, modular buildings and portable workspace solutions for different sites.
Product Dispensers
Automated dispensers for tools, PPE, maintenance supplies and industrial consumables.
Fabricated Equipment Packages
Custom fabricated equipment, mechanical assemblies and complete packaged industrial systems.
Even Diamond and Gold Rings!
Our supplier network can also assist with unique products outside traditional industrial categories.
Ideal Projects
Our sourcing model is suitable for new projects, facility upgrades, replacement equipment and custom requirements.
Facility Upgrades
Modernise existing equipment and improve efficiency across industrial and commercial facilities.
New Construction
Source equipment and systems for new facilities, expansions and ground-up construction projects.
Retrofit and Replacement
Replace ageing equipment with comparable, dependable and cost-effective alternatives.
OEM and Fabrication Support
Source components and systems for OEM, fabrication and manufacturing operations.
What Makes a Good Fit
Clear project information helps us identify accurate suppliers and prepare a stronger sourcing comparison.
Clear Specifications
Provide drawings, specifications, datasheets and important technical requirements.
Performance Requirements
Define capacity, ratings, operating conditions and required performance targets.
Target Budget
Share your expected budget range to help identify practical supplier options.
Quantity
Estimated quantity or annual usage may support stronger manufacturer pricing.
Delivery Location
Provide the delivery destination for freight, duty and logistics planning.
Timeline
Share the required delivery date and important project milestone expectations.
Supplier Screening Criteria
Potential suppliers are considered against manufacturing, quality, commercial and logistics requirements.
Factory Capability
Production capacity, equipment, engineering resources and technical expertise.
Certifications
Relevant ISO, CE, UL and industry-specific certifications where required.
Quality Systems
Quality-control processes, testing, inspections and production documentation.
Warranty Terms
Warranty coverage, technical support and available after-sales service.
Lead Times
Confirmed production schedules and realistic delivery timeframes.
Export Experience
Experience with international orders, shipping, documentation and compliance.
Sample Savings
These examples demonstrate potential differences between market prices and sourced manufacturer pricing.
| Equipment | Market Price | Sourced Price | Estimated Savings |
|---|---|---|---|
| Chiller | $103,000 | $35,000 | 66% |
| Warehouse Fan | $84,000 | $30,000 | 64% |
| Modular Offices | $120,000 | $60,000 | 50% |
| CNC Machine | $190,000 | $46,000 | 76% |
| Custom Skids | $300,000 | $120,000 | 60% |
| Commercial HVAC | $30,000 | $15,000 | 50% |
Actual savings depend on specifications, certifications, freight, duties, tariffs, lead time, quantity, warranty terms and final supplier selection.
Need help sourcing a category not listed here?
Our team can search for the right solution through our global supplier network.
